Skip to content
EmojiDex.

OpenMoji

Construction on OpenMoji

HfG Schwäbisch Gmünd has drawn Construction 11 times. Every revision OpenMoji has shipped is below, newest first.

  1. Construction as drawn by OpenMoji in 17.017.0 ✳
  2. Construction as drawn by OpenMoji in 16.016.0 ✳
  3. Construction as drawn by OpenMoji in 15.115.1 ✳
  4. Construction as drawn by OpenMoji in 15.015.0 ✳
  5. Construction as drawn by OpenMoji in 14.014.0 ✳
  6. Construction as drawn by OpenMoji in 13.113.1
  7. Construction as drawn by OpenMoji in 13.013.0 ✳
  8. Construction as drawn by OpenMoji in 12.312.3
  9. Construction as drawn by OpenMoji in 12.212.2
  10. Construction as drawn by OpenMoji in 12.012.0 ✳
  11. Construction as drawn by OpenMoji in 1.01.0 ✳

Construction on other platforms

Frequently asked questions

What does Construction look like on OpenMoji?
On OpenMoji it is the design shipped in 17.0, shown above at full size. Older revisions are listed beneath it.
When did OpenMoji add Construction?
OpenMoji first drew Construction in 1.0, released April 18, 2018.
How many times has OpenMoji redrawn Construction?
HfG Schwäbisch Gmünd has shipped 11 versions of Construction. Each is dated, so you can see when the design changed.

OpenMoji artwork for this emoji spans 2018 to 2026.

Construction on OpenMoji · EmojiDex